Here Are This Week’s Traffic Trouble Spots

April 13, 2026

Drivers will encounter traffic disruptions on the following state roads and projects in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

Escambia County:

  • State Road (S.R.) 296 (Brent Lane/Bayou Boulevard) Resurfacing, from Davis Highway (S.R. 291) to Baisden Road – Drivers may encounter the following traffic disruptions, Sunday, April 12 through Thursday, April 16, between 8 p.m. and 5:30 a.m., for paving operations and placement of thermoplastic striping:
    • Intermittent lane closures on Brent Lane/Bayou Boulevard, from Davis Highway to Baisden Road.
    • On-street parking closures on Bayou Boulevard, between 12th Avenue and Baisden Road.
  • S.R. 289 (Ninth Avenue) Resurfacing from S.R. 274 (Creighton Road) to Olive Road – Drivers may encounter intermittent lane closures on Ninth Avenue, between Creighton Road and Olive Road, Sunday, April 12 through Thursday, April 16, between 8 p.m. and 6 a.m., for placement of thermoplastic striping.
  • S.R. 296 (Michigan Avenue) Resurfacing from Mobile Highway (U.S. 90) to North Palafox Street (U.S. 29) – The week of Sunday, April 12, drivers may encounter intermittent lane closures on Michigan Avenue from Mobile Highway to North Palafox Street between 7 p.m. and 6 a.m. for placement of thermoplastic striping.
  • S.R. 292 (Gulf Beach Highway) from east of Bauer Road (County Road (C.R.) 293) to Manchester Street The week of Sunday, April 12, drivers may encounter intermittent lane closures on S.R. 292 from east of Bauer Road to Manchester Street, between 8 p.m. and 6 a.m., for construction activities. Additionally, a new traffic configuration has been implemented on S.R. 292 between Mills Avenue and just east of Patton Drive, with travel lanes shifted to the outside of the roadway to provide space to construct a median traffic separator. Channelizing devices are in place to delineate the work zone. The speed limit has been reduced to 35 mph throughout the work zone.
  • Business U.S. 98 (Garden Street) Construction from Pace Boulevard to the Interstate 110 (I- 110) ramp – The week of Sunday, April 12, drivers may encounter the following construction-related traffic disruptions:
    • Garden Street, between Pace Boulevard and N. Donelson Street, is reduced to two travel lanes (one in each direction) as crews perform construction activities on the north side of the street. This temporary traffic configuration will be in place through late 2026.
    • On-street parking is closed on Garden Street, between B Street and L Street.
  • Interstate 10 (I-10) Resurfacing from east of U.S. 29 to east of Davis Highway (S.R. 291) – Drivers may encounter the following construction-related traffic disruptions Sunday, April 12 through Thursday, April 16, from 8 p.m. to 6 a.m. for paving operations and guardrail installation:
    • Intermittent lane closures on I-10 between mile markers 11 and 14.
    • Intermittent lane closures on the I-10 ramps to access Interstate 110 (I-110) southbound (Exit 12) and Davis Highway (Exit 13).
  • I-110 Resurfacing from I-10 to U.S. 98 – Drivers may encounter the following construction-related traffic disruptions Sunday, April 12 through Thursday, April 16, from 8 p.m. to 6 a.m. for paving operations and roadway lighting installation:
    • Intermittent lane closures on the I-110 ramps to Brent Lane (S.R. 296) and Airport Boulevard (Exit 5).
    • Intermittent I-110 lane closures near the Creighton Road overpass.
  • I-10 at Nine Mile Road Interchange (Exit 5) Construction – Drivers will encounter the following construction-related traffic disruptions:
    • Intermittent outside lane closures on I-10 westbound near the Nine Mile Road interchange, Sunday, April 12 through Thursday, April 16, from 8 p.m. to 6 a.m.
    • Nine Mile Road will be reduced to one travel lane in each direction between the I-10 ramps, Sunday, April 12 through Friday, April 17, from 8 p.m. to 6 a.m. Law enforcement will be on site, and directional signage will be in place to guide drivers through the work zone.
    • Temporary reconfiguration of the I-10 westbound ramps, which will remain in place through mid-2026.
  • I-10 at U.S. 29 Interchange (Exit 10) Construction – The week of Sunday, April 12, drivers will encounter the following construction-related traffic disruptions:
    • I-10 is reduced to two travel lanes in each direction between U.S. 29 and I-110.
    • I-10 travel lanes are shifted away from the median area of the roadway, near the U.S. 29 interchange.
    • The U.S. 29 southbound access to the I-10 eastbound on-ramp has been reduced.
    • The U.S. 29 northbound ramp to I-10 eastbound is closed. U.S. 29 northbound drivers are being detoured to make a U-turn at Broad Street onto U.S. 29 southbound to access I-10 eastbound.
  • S.R. 97 (Atmore Highway) Resurfacing from U.S. 29 to the Alabama State Line– Motorists will encounter the following traffic impacts:
    • Intermittent lane and shoulder closures are to be expected throughout the project limits on Monday, April 13 through Friday, April 17, from 7 a.m. to 5 p.m. for median improvements.
    • Lane closures are to be expected at S.R. 95 and S.R. 97 on Monday, April 13, through Friday, April 17, from 7 A.M. – 5 P.M. for median improvements.

Santa Rosa County:

  • U.S. 98 Widening from Bayshore Road to Portside Drive – Motorists will encounter the following traffic impacts:
    • Median and turn lane closures from Bayshore Road to Tiger Lake Drive.
    • Intermittent lane closures and additional median closures between Bayshore Road and Tiger Lake Drive, Sunday, April 12 through Friday, April 17, from 9 a.m. to 5:30 p.m. for paving operations.
  • U.S. 90 Resurfacing from Escambia River Bridge to east of Woodbine Road (C.R. 197A) – Drivers may encounter intermittent lane closures on U.S. 90, from Escambia River Bridge to Woodbine Road, Sunday, April 12 through Thursday, April 16, between 7 p.m. and 5:30 a.m., for guardrail installation. Additionally, the speed limit has been reduced to 45 mph through the work zone.

All activities are weather dependent and may be delayed or rescheduled in the event of inclement weathe

Comments





Have a comment on this story?

We welcome your comments on this story, but there are some rules to follow::

(1) Be Nice. No comments that slander another, no racism, no sexism, no personal attacks.

(2) No Harrassing Comments. If someone says something bad about you, don't respond. That's childish.

(3) No Libel. That's saying something is not true about someone. Don't do it.

(4) Keep it clean. Nothing vulgar, obscene or sexually related. No profanity or obvious substitutions. Period.

(5) NorthEscambia.com reserves the right to remove any comments that violate our rules or we think to be inappropriate. We are not responsible for what is posted. Comments may not appear right away until they are approved by a moderator.

(6) Limit your comments to the subject in this story only, and limit comments to 300 words or less. Do not post copyrighted material. Comments will not be added to stories that are over 30 days old.

(7) No posts may advertise a commercial business, political candidate or political group, or link to another commercial web site or political site of any kind.

  NEfb