Tech Help Monday: Microsoft Office At The Molino Library
July 27, 2025
The Molino Library will host a tech help session on Microsoft Office on Monday morning.
Attendees will learn how to unlock the full potential of Microsoft Office using free online tools available through the library. In this hands-on session, you’ll learn how to navigate Word, Excel, PowerPoint, and more, whether for work, school, or personal projects.
The event will take place at 10 a.m. on Monday, July 28 at the Molino Library, 6450-A Highway 95A in the Molino Community Center.
New 7Brew Coffee Shop Planned For Corner Of Nine Mile And University
July 27, 2025
A new 7 Brew coffee is proposed for the corner of East Nine Mile Road and University Parkway, according to plans filed with Escambia County.
The 540 square foot coffee shop, a 230 square foot remote cooler, associated drive-thru, and parking would be located on 1.14 acres on the southwest corner near existing shopping center with Publix and Target.
The proposed 7 Brew is set for a pre-application meeting on Wednesday, July 30 with the Escambia County Development Review Committee.
Pictured: The latest 7Brew in Escambia and Santa Rosa counties opened on July 23 in Gulf Breeze. Photo for NorthEscambia.com. Pictured below: A 7 Brew planned for Nine Mile and University. NorthEscambia.com graphic.
Here Are This Week’s Traffic Slow Down Construction Spots
July 27, 2025
Drivers will encounter traffic disruptions on the following state roads and projects in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.
Escambia County:
- Beulah Road (State Road (S.R.) 99) Resurfacing from Mobile Highway (S.R. 10A) to Isaacs Lane – Beulah Road is temporarily closed at the Beulah Church Road intersection for drainage construction. Signs are in place to detour drivers around the work zone using Rebel Road, Mobile Highway and Nine Mile Road.
- S.R. 292 (Gulf Beach Highway) Resurfacing from Gulf Beach Highway to Manchester Street – The week of Sunday, July 27, drivers may encounter intermittent lane closures on Gulf Beach Highway, from 8 p.m. to 6 a.m. for milling and resurfacing.
- U.S. 90 (Scenic Highway) Resurfacing, from south of Interstate 10 (I-10) to south of Hyde Park Road – Drivers on Scenic Highway will encounter the following construction-related traffic disruptions:
- Beginning Monday, July 28, the Scenic Highway southbound right-turn lane will be temporarily closed at the Hyde Park Road intersection for a period of three days, as crews perform stormwater drainage work. Drivers may utilize the Scenic Highway southbound travel lane to access Hyde Park Road.
- Intermittent lane closures, from south of I-10 to south of Hyde Park Road, Sunday, July 27 through Thursday, July 31, from 8 p.m. to 5:30 a.m., for paving operations. Law enforcement will be on site and traffic flaggers will direct drivers safely through the work zone.
- Brent Lane/Bayou Boulevard (S.R. 296) Resurfacing from Davis Highway (S.R. 291) to Baisden Road – Drivers may encounter the following traffic disruptions, Sunday, July 27 through Thursday, July 31 between 8 p.m. and 5:30 a.m. for milling and paving operations:
- Intermittent lane closures on Brent Lane/Bayou Boulevard, from Davis Highway to Baisden Road.
- On-street parking closures on Bayou Boulevard, between 12th Avenue and Baisden Road.
- Garden Street (Business U.S. 98) Construction from Pace Boulevard to the Interstate 110 (I-110) Ramp – The week of Sunday, July 27, drivers may encounter the following construction-related traffic disruptions:
- B Street, between Garden Street and Romana Street, is closed for stormwater management enhancements. Signs will be in place to detour drivers around the work zone using Garden Street, A Street and Romana Street.
- Garden Street, between Pace Boulevard and N. Donelson Street, is reduced to two travel lanes (one in each direction), as crews perform construction activities on the south side of the street. This temporary traffic configuration will be in place through early 2026.
- Temporary side street closures south of Garden Street, from B Street to J Street, as crews perform utility and stormwater management enhancements.
- On-street parking is closed on the south side of Garden Street, between B Street and L Street. Additionally, periodic on-street parking closures will occur on Garden Street, between A Street and Alcaniz Street, for sidewalk and crosswalk improvements.
- Pine Forest Road (S.R. 297) Resurfacing from Mobile Highway (U.S. 90) to Blue Angel Parkway (S.R. 173) – The week of Sunday, July 27 drivers may encounter intermittent lane closures on Pine Forest Road, from Mobile Highway to Blue Angel Parkway, between 7 p.m. and 6 a.m., for placement of thermoplastic striping.
- Interstate Circle Bridge Over Eight Mile Creek Construction – Interstate Circle is closed at the Eight Mile Creek Bridge through mid-2025 while crews replace the bridge. Signs are in place to detour drivers around the work zone using Pine Forest Road, Longleaf Drive and Wymart Road.
- I-10 at Nine Mile Road Interchange (Exit 5) Construction – Drivers will encounter the following construction-related traffic disruptions:
- Intermittent I-10 inside lane closures near the Nine Mile Road interchange, Sunday, July 27 through Thursday, July 31, from 8 p.m. to 6 a.m.
- Nine Mile Road will be reduced to one travel lane in each direction between the I-10 ramps, Sunday, July 27 through Friday, Aug. 1, from 8 p.m. to 6 a.m. Law enforcement will be on site, and directional signage will be in place to guide drivers through the work zone.
- I-10 at U.S. 29 Interchange (Exit 10) Construction – Drivers will encounter the following construction-related traffic disruptions from Sunday, July 27 through Friday, Aug. 1:
- Intermittent I-10 westbound outside lane closures will occur from 8 p.m. and 6 a.m. between mile markers 10 and 12 for materials delivery at the North Palafox Street overpass.
- Intermittent daytime lane closures will occur on North Palafox Street between Whitehead Drive and Hope Drive at the Palafox Street overpass to allow crews to complete pile driving operations. Flaggers will be present to direct traffic through the work zone.
- I-10 east and westbound travel lanes are shifted away from the median area of the roadway, between mile markers 10 and 12, near the U.S. 29 interchange.
- The length of the U.S. 29 southbound turn lane access to the I-10 eastbound on-ramp has been permanently reduced to allow crews to complete construction activities. A concrete barrier wall and new pavement striping is in place to direct traffic through the work zone.
- I-10 between U.S. 29 and I-110, is reduced to two travel lanes in each direction.
- The U.S. 29 northbound ramp to I-10 eastbound is closed. U.S. 29 northbound drivers are being detoured to make a U-turn at Broad Street onto U.S. 29 southbound to access I-10 eastbound.
- S.R. 291 (Dr Martin Luther King Jr Drive) Routine Utility Maintenance north of East Texar Drive – Motorists may encounter intermittent lane closures Monday, July 28 and Tuesday, July 29 from 8 a.m. to 4 p.m. to install new power poles.
- S.R. 95 (North Palafox Street) Routine Underground Utility Maintenance from West Lloyd Street to West Gonzalea Street – Motorists may encounter intermittent lane closures Sunday, July 27 through Tuesday, Aug. 5 from 8 p.m. to 6 a.m. for routine underground utility maintenance.
Santa Rosa County:
- U.S. 98 Turn Lane Operations near Mohawk Trail – Motorists may encounter intermittent outside eastbound lane closures Sunday, July 27 through Thursday, July 31 from 8 p.m. to 5 a.m. to construct a new turn lane.
- U.S. 90 Resurfacing from west of Avalon Boulevard to east of Stewart Street – Drivers may encounter intermittent U.S. 90 lane closures, between Avalon Boulevard and Stewart Street, Sunday, July 27 through Thursday, July 31, from 7 p.m. to 5:30 a.m., for shoulder work and placement of thermoplastic striping.
- S.R. 87 Resurfacing, from south of East Bay Boulevard (County Road 399) to Vonnie Tolbert Road – Drivers may encounter intermittent lane closures on S.R. 87, from East Bay Boulevard to Vonnie Tolbert Road, Monday, July 28 through Friday, Aug. 1, between 7 a.m. and 5 p.m., for concrete repair work and paving operations.
- U.S. 98 Widening from Bayshore Road to Portside Drive – Motorists will encounter the following traffic impacts:
- Median and turn-lane closures from Bayshore Road to Tiger Lake Drive.
- Intermittent lane closures and additional median closures between Bayshore Road and Tiger Lake Drive, Sunday, July 27, through Friday, Aug. 1 from 9 p.m. to 5:30 a.m. for paving operations.
All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather.
Photos: Incoming Northview Seniors Paint Their Parking Spaces
July 27, 2025
Members of the Northview High School Class of 2026 had a chance to paint and personalize their parking spaces on Saturday morning.
Photos for NorthEscambia.com, click to enlarge.
White Fans 14 In Historic Performance For Blue Wahoos
July 27, 2025
written by Erik Bremer
Thomas White put together one of the most dominant performances in Minor League Baseball history Saturday night, striking out a career-high 14 batters over 5.0 scoreless innings as the Pensacola Blue Wahoos fell 4-2 to the Knoxville Smokies.
White, 20, the top prospect in the Miami Marlins organization, struck out 14 of the 17 men he faced in the most commanding start of his career. Scattering two singles without walking a batter, White tied a modern Southern League record by striking out eight consecutive batters from the final out of the first inning to the first out of the fourth inning. His 14 strikeouts were the most in a Minor League Baseball game this season, and second only to Tony Cingrani’s 15 strikeouts over 8.0 innings in 2012 for the most in by a single pitcher in Blue Wahoos history.
White struck out 13 of the final 14 batters he faced, a feat that has not been accomplished in Major League Baseball in the Expansion Era (since 1961).
The game was a low-scoring affair, with Knoxville starter Ryan Gallagher matching White’s zeroes and pitching into the seventh inning in a scoreless game. Johnny Olmstead broke the deadlock with a two-run homer in the seventh against Frankie Scalzo Jr. (W, 4-3), his 10th of the year to tie for the team lead.
The Blue Wahoos had gone 37-0 when leading after seven innings, but the Smokies put together a two-out rally in the bottom of the eighth inning to turn the tables. Jaylen Palmer beat out an infield single before Jefferson Rojas hit an RBI double off the left field wall. Pedro Ramirez walked, putting two runners aboard for BJ Murray Jr., Knoxville’s most potent power threat. The switch-hitting first baseman blasted a three-run shot off Nigel Belgrave (L, 4-1), ending a streak of 11 consecutive appearances without allowing an earned run for the Blue Wahoos righty and giving the Smokies a 4-2 lead.
Tyler Santana (S, 3) worked a spotless ninth to end Pensacola’s five-game winning streak and Knoxville’s seven-game losing streak.
The Blue Wahoos wrap up their series against the Smokies on Sunday afternoon.
FDLE: He Thought He Was Meeting A 14-Year Old Girl At the Movies, But He Was Busted
July 26, 2025
He thought he was meeting a 14-year old girl at the movies, an the Florida Department of Law Enforcement said he thought he had been grooming her for 10 months.
When he we meant to meet the girls at a local theater, he was met by an undercover state agent.
“No popcorn, no previews—just a one-way ticket to jail, five felony charges and no chance at a sequel,” FDLE said.
FDLE said 32-year-old Chad Anthony Forster, a resident of Allison Lane just behind Whataburger on Nine Mile Road, was charged with traveling to meet a minor for sex, soliciting a minor to engage in sexual activity and promoting the sexual performance of a child and two felony counts for sending harmful material to a minor.
The investigation began in September 2024 when Forster began communicating with an undercover agent, who was disguised as a juvenile girl, according to investigators. Throughout the course of the communication, Forster solicited the child persona to engage in sexual activity, including requesting child sexual abuse material and sending explicit images of himself.
Through continued investigative communication, the undercover agent agreed to meet at a local movie theater on Thursday, July 24. Once he arrived, FDLE agents arrested Forster.
He was transported to the Escambia County Jail and booked with bond set at $80,000.
FDLE said the arrest is a result of the agency’s statewide initiative to locate and arrest criminals soliciting children online for a sexual relationship online and sharing files depicting the sexual abuse of children.
Photos for NorthEscambia.com, click to enlarge.
$21.8 Million, 3.5-Year Project Completed On Highway 90 Bridges Between Escambia, Santa Rosa
July 26, 2025
The Florida Department of Transportation (FDOT) has completed a $21.8 million bridge replacement project on Highway 90 over the Simpson River in Santa Rosa County, a frequent route between Escambia and Santa Rosa counties.
The project included the reconstruction of the eastbound structure and widening of the westbound structure. The final configuration includes two 12-foot travel lanes (in each direction) with 10-foot outside shoulders flanked with bike lanes.
Additional improvements include:
Milling and resurfacing the bridge approaches.
Improving drainage, including reconstructing concrete curb and gutter.
Installing new signage and guardrail.
The speed limit, which was reduced during construction, was immediately returned to 55 mph.
Work began in January 2022.
Escambia Man Faces Max Of Life In Prison On Drug, Firearm Charges
July 26, 2025
An Escambia County man has pleaded guilty to federal drug and firearm charges.
Timothy Lamar McGee, 42, pleaded in federal court for possession of more than 500 grams of cocaine, tetrahydrocannabinol, and marijuana with intent to distribute and possession of a firearm in furtherance of a drug trafficking offense.
According to documents, law enforcement executed a search warrant at McGee’s residence in September 2024. During a search of the residence, investigators located more than 600 grams of cocaine, more than 300 grams of tetrahydrocannabinol, more than 1,000 grams of marijuana, approximately $32,000 in United States currency, and four firearms.
McGee faces a minimum mandatory term of five years of imprisonment on each charge, to run consecutively, with the possibility of life imprisonment. He will be sentenced on October 1.
Century Reports 5,000 Gallon Spill At Wastewater Plant
July 26, 2025
The Town of Century reported a 5,000 gallon spill at their wastewater treatment plant on Friday, according to a report filed with the Florida Department of Environmental Protection.
Effluent pumps at the facility on Jefferson Avenue had an electrical issue that caused the treated wastewater to spill for seven and one-half hours.
The spill, according to the report, was cleaned by applying lime.
Pictured: The Century Wastewater Treatment Plant. NorthEscambia.com file photo, click to enlarge.
New Heavy Equipment Retail Business Proposed For Highway 29 In Cantonment
July 26, 2025
A heavy equipment retail business is being proposed for Highway 29 in Cantonment.
Gibbs Equipment filed plans with the Escambia County Development Review Committee (DRC) for the business on 4.81 acres on at 1170 North Highway 29, on the east side of the highway just south of Neal Road. According to the application, there are two old houses on the property.
The plans include a proposed 11,900 square foot building, with about 25 parking spaces. Most of the retail lot would be gravel, with access to both Nealt Road and Highway 29.
The proposal is in the internal review process with DRC with a public meeting not yet set.
NorthEscambia.com graphic.
















