<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Escambia County Seeks Public Input On $4.57 Million O.C. Phillips Bridge Replacement</title>
	<atom:link href="http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Thu, 23 Apr 2026 14:06:31 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: David Dunlap</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583360</link>
		<dc:creator>David Dunlap</dc:creator>
		<pubDate>Sat, 03 Jan 2026 05:50:05 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583360</guid>
		<description>To close off OC Phillips rd. Is out of the question. 
There are too many people who rely on this connector 
to Pineville rd. To require users to either traverse the length 
Of Pineville rd to or from the south or go all the way around 
utilizing Arthur Brown rd is just terribly unfair, costly, and
very time consuming to the citizens. 
REPLACE THE BRIDGE.</description>
		<content:encoded><![CDATA[<p>To close off OC Phillips rd. Is out of the question.<br />
There are too many people who rely on this connector<br />
to Pineville rd. To require users to either traverse the length<br />
Of Pineville rd to or from the south or go all the way around<br />
utilizing Arthur Brown rd is just terribly unfair, costly, and<br />
very time consuming to the citizens.<br />
REPLACE THE BRIDGE.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Hmm</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583332</link>
		<dc:creator>Hmm</dc:creator>
		<pubDate>Thu, 01 Jan 2026 14:34:43 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583332</guid>
		<description>The temporary bridge is probably a million dollars itself.  Then the new bridge will be elevated above the existing height leading to a lot of dirt work. Likely some paving and drainage at each end of the bridge. Throw in today&#039;s super elevated construction costs and suck it up buttercup here we are.</description>
		<content:encoded><![CDATA[<p>The temporary bridge is probably a million dollars itself.  Then the new bridge will be elevated above the existing height leading to a lot of dirt work. Likely some paving and drainage at each end of the bridge. Throw in today&#8217;s super elevated construction costs and suck it up buttercup here we are.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Richard b</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583320</link>
		<dc:creator>Richard b</dc:creator>
		<pubDate>Thu, 01 Jan 2026 03:52:22 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583320</guid>
		<description>$56,000 a foot for a 2 lane bridge,    will it be made of gold,,,,</description>
		<content:encoded><![CDATA[<p>$56,000 a foot for a 2 lane bridge,    will it be made of gold,,,,</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: DAO</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583317</link>
		<dc:creator>DAO</dc:creator>
		<pubDate>Thu, 01 Jan 2026 01:27:57 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583317</guid>
		<description>SW unless you can obtain the needed Right of way aka county owned land to do improvements they can not pave the road, they only have a maintenance claim no ownership.</description>
		<content:encoded><![CDATA[<p>SW unless you can obtain the needed Right of way aka county owned land to do improvements they can not pave the road, they only have a maintenance claim no ownership.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Just Close The Roaf</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583316</link>
		<dc:creator>Just Close The Roaf</dc:creator>
		<pubDate>Wed, 31 Dec 2025 22:19:47 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583316</guid>
		<description>CLOSE The ROAD and don&#039;t replace the bridge. 
Use the money to pave Highway 164 to make it saver or something more practical for the north end of Escambia County Florida. Just saying.</description>
		<content:encoded><![CDATA[<p>CLOSE The ROAD and don&#8217;t replace the bridge.<br />
Use the money to pave Highway 164 to make it saver or something more practical for the north end of Escambia County Florida. Just saying.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: rd</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583307</link>
		<dc:creator>rd</dc:creator>
		<pubDate>Wed, 31 Dec 2025 16:44:45 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583307</guid>
		<description>@KRIS W.  I am with you 100%. There has got to be a lower cost solution for replacing these old bridges. I am not sure what it is but 80&#039; of bridge should not cost $57,000/linear foot.</description>
		<content:encoded><![CDATA[<p>@KRIS W.  I am with you 100%. There has got to be a lower cost solution for replacing these old bridges. I am not sure what it is but 80&#8242; of bridge should not cost $57,000/linear foot.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: van-halen</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583306</link>
		<dc:creator>van-halen</dc:creator>
		<pubDate>Wed, 31 Dec 2025 16:37:32 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583306</guid>
		<description>well only what they have decided they want to hear more of.</description>
		<content:encoded><![CDATA[<p>well only what they have decided they want to hear more of.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Aaron</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583301</link>
		<dc:creator>Aaron</dc:creator>
		<pubDate>Wed, 31 Dec 2025 15:09:04 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583301</guid>
		<description>Y&#039;all better be careful down there in them Woods.
Bigfoot has been known to roam about freely there, making dirt disappear and loves to play with barricades.</description>
		<content:encoded><![CDATA[<p>Y&#8217;all better be careful down there in them Woods.<br />
Bigfoot has been known to roam about freely there, making dirt disappear and loves to play with barricades.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Pineville resident</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583297</link>
		<dc:creator>Pineville resident</dc:creator>
		<pubDate>Wed, 31 Dec 2025 14:37:16 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583297</guid>
		<description>Wouldn&#039;t it just be cheaper to pave the long road outbound (Pinville rd
) , and just close that road off at the top where Occie comes into Pineville and at
Where the houses end on Occie ?</description>
		<content:encoded><![CDATA[<p>Wouldn&#8217;t it just be cheaper to pave the long road outbound (Pinville rd<br />
) , and just close that road off at the top where Occie comes into Pineville and at<br />
Where the houses end on Occie ?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: mnon</title>
		<link>http://www.northescambia.com/2025/12/escambia-county-seeks-public-input-on-4-57-million-o-c-phillips-bridge-replacement/comment-page-1#comment-583287</link>
		<dc:creator>mnon</dc:creator>
		<pubDate>Wed, 31 Dec 2025 12:22:35 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=608225#comment-583287</guid>
		<description>Blows my mind its still all dirt out there and this bridge is so old, it was old 40 years ago when I was there.</description>
		<content:encoded><![CDATA[<p>Blows my mind its still all dirt out there and this bridge is so old, it was old 40 years ago when I was there.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
