<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Resurfacing Project Nearing Completion On Highway 196</title>
	<atom:link href="http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Sat, 04 Apr 2026 11:54:58 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Jlb</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548969</link>
		<dc:creator>Jlb</dc:creator>
		<pubDate>Sun, 11 Aug 2024 13:16:29 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548969</guid>
		<description>Great resurfaced...how about some actual improvements for safty.</description>
		<content:encoded><![CDATA[<p>Great resurfaced&#8230;how about some actual improvements for safty.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: dannyb</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548766</link>
		<dc:creator>dannyb</dc:creator>
		<pubDate>Wed, 07 Aug 2024 23:17:42 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548766</guid>
		<description>After the county replaced their gas lines they messed up my driveway connection to hwy95a. Then the resurface came and Roads inc. left a 4 inch drop off from roadway to my driveway at 4887 hwy 95a north.</description>
		<content:encoded><![CDATA[<p>After the county replaced their gas lines they messed up my driveway connection to hwy95a. Then the resurface came and Roads inc. left a 4 inch drop off from roadway to my driveway at 4887 hwy 95a north.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: D. Flowers</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548723</link>
		<dc:creator>D. Flowers</dc:creator>
		<pubDate>Wed, 07 Aug 2024 05:29:38 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548723</guid>
		<description>There is a line item in the contract that pays for traffic control.  If the contractor is remiss they can always have money deducted for failure to deliver services.   The County Engineering Department provides an inspector for each project.  They do a good job but are stretched thin.   If you see a problem, report it via telephone, email or the &quot;trouble&quot; link.  All that is googleable.   In my own experience the County, contractors and inspectors do a good job but lapses can occur.  I also know that County doesn&#039;t mind feedback, good or bad.  It all combines to get better and stay better at what they do.   Those were good people I used to work with.</description>
		<content:encoded><![CDATA[<p>There is a line item in the contract that pays for traffic control.  If the contractor is remiss they can always have money deducted for failure to deliver services.   The County Engineering Department provides an inspector for each project.  They do a good job but are stretched thin.   If you see a problem, report it via telephone, email or the &#8220;trouble&#8221; link.  All that is googleable.   In my own experience the County, contractors and inspectors do a good job but lapses can occur.  I also know that County doesn&#8217;t mind feedback, good or bad.  It all combines to get better and stay better at what they do.   Those were good people I used to work with.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: CHARLES</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548699</link>
		<dc:creator>CHARLES</dc:creator>
		<pubDate>Tue, 06 Aug 2024 21:25:39 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548699</guid>
		<description>Today is supposed to be the last day of paving on 196. Nice to see after I called county and complained about them closing the whole road, with no advance warning signs, or a place to turn around, they have flaggers at each intersection today.</description>
		<content:encoded><![CDATA[<p>Today is supposed to be the last day of paving on 196. Nice to see after I called county and complained about them closing the whole road, with no advance warning signs, or a place to turn around, they have flaggers at each intersection today.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: EMD</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548690</link>
		<dc:creator>EMD</dc:creator>
		<pubDate>Tue, 06 Aug 2024 16:00:13 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548690</guid>
		<description>JJ  Have you found tnat government equals lies?</description>
		<content:encoded><![CDATA[<p>JJ  Have you found tnat government equals lies?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Christina</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548687</link>
		<dc:creator>Christina</dc:creator>
		<pubDate>Tue, 06 Aug 2024 14:36:07 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548687</guid>
		<description>Worst road crew ever! Don’t foresee it making a difference. The lanes were already in need of being widened and a shoulder would be great but not looking like they planned well at all. When you come out of your neighborhood and there’s no direction on which side on 196 is closed because the idiots can’t put a sign to let you know! Lost cause…</description>
		<content:encoded><![CDATA[<p>Worst road crew ever! Don’t foresee it making a difference. The lanes were already in need of being widened and a shoulder would be great but not looking like they planned well at all. When you come out of your neighborhood and there’s no direction on which side on 196 is closed because the idiots can’t put a sign to let you know! Lost cause…</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: JJ</title>
		<link>http://www.northescambia.com/2024/08/resurfacing-project-nearing-completion-on-highway-196/comment-page-1#comment-548668</link>
		<dc:creator>JJ</dc:creator>
		<pubDate>Tue, 06 Aug 2024 07:38:52 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=556788#comment-548668</guid>
		<description>Pray the shoulder work is better than the two miles on Schaag Rd that intersects with 196.
OOPS, I FORGOT,Road INC didnt do any shoulder work and left 4-8&quot; dropoff  from pavement at the mailboxes.
Road Department came out and I was told R.I. would fix the problem. Not one piece of sod ,seeds or fill dirt was ever put down and the road was cracking within a year of my completion! CHECK IT OUT NORTH ESCAMBIA?</description>
		<content:encoded><![CDATA[<p>Pray the shoulder work is better than the two miles on Schaag Rd that intersects with 196.<br />
OOPS, I FORGOT,Road INC didnt do any shoulder work and left 4-8&#8243; dropoff  from pavement at the mailboxes.<br />
Road Department came out and I was told R.I. would fix the problem. Not one piece of sod ,seeds or fill dirt was ever put down and the road was cracking within a year of my completion! CHECK IT OUT NORTH ESCAMBIA?</p>
]]></content:encoded>
	</item>
</channel>
</rss>
