<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: After A 10 Day Holiday Break, Road Construction Delays Return Tuesday</title>
	<atom:link href="http://www.northescambia.com/2023/01/after-a-10-day-holiday-break-road-construction-delays-return-tuesday/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2023/01/after-a-10-day-holiday-break-road-construction-delays-return-tuesday</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Sun, 20 Sep 2026 17:04:24 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Richard Klosinski</title>
		<link>http://www.northescambia.com/2023/01/after-a-10-day-holiday-break-road-construction-delays-return-tuesday/comment-page-1#comment-510449</link>
		<dc:creator>Richard Klosinski</dc:creator>
		<pubDate>Sat, 11 Feb 2023 18:10:58 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=500734#comment-510449</guid>
		<description>Hiway 98 through Gulf Breeze.

Q 1.  Will there be a sidewalk/multi path from bayshore to port side.

Q 2.  Will the sidewalk continue all the way from Bayshore through the naval live oaks.  

Q 3.  The turn lanes at Kelton and Venetian way are dangerous, with multiple accidents at the intersection.  The entrances to both are not functional, vehicles have to make turns sometimes into blind traffic.  Why not reduce the size of these entrances, and if not make these turns from 98 only on a green arrow only.

Q 4. When is the drainage/storage pond going to be completed adjacent ti grand pointe.</description>
		<content:encoded><![CDATA[<p>Hiway 98 through Gulf Breeze.</p>
<p>Q 1.  Will there be a sidewalk/multi path from bayshore to port side.</p>
<p>Q 2.  Will the sidewalk continue all the way from Bayshore through the naval live oaks.  </p>
<p>Q 3.  The turn lanes at Kelton and Venetian way are dangerous, with multiple accidents at the intersection.  The entrances to both are not functional, vehicles have to make turns sometimes into blind traffic.  Why not reduce the size of these entrances, and if not make these turns from 98 only on a green arrow only.</p>
<p>Q 4. When is the drainage/storage pond going to be completed adjacent ti grand pointe.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
