<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: FDOT Virtual Update: Nine Mile Road Study From Pine Forest To Mobile Highway</title>
	<atom:link href="http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Sat, 04 Apr 2026 16:32:57 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Scot Dixon</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426988</link>
		<dc:creator>Scot Dixon</dc:creator>
		<pubDate>Tue, 08 Sep 2020 12:44:24 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426988</guid>
		<description>FDOT: Finish the current project you have going on along that exact same stretch of road FIRST before planning the next change. You don&#039;t even know the impact of the current changes yet. Get out there, in person, and oversee the project. It&#039;s horrible. They&#039;ve been at it for over 4 years, and it still looks like they&#039;ve barely started. &quot;Our tax dollars at sleep.&quot; The current project is very simple, yet it&#039;s taking years just to modify a few miles of flat road. After Ivan, the I-10 bridge across Escambia Bay took less time to plan, survey, and build. This is like I-110 all over again: years and years of running a road project like a jobs program, making multiple mistakes, and ending up with a design that a smart 8th grader couple improve upon with an hour of observation and analysis. We deserve better. Follow the money.</description>
		<content:encoded><![CDATA[<p>FDOT: Finish the current project you have going on along that exact same stretch of road FIRST before planning the next change. You don&#8217;t even know the impact of the current changes yet. Get out there, in person, and oversee the project. It&#8217;s horrible. They&#8217;ve been at it for over 4 years, and it still looks like they&#8217;ve barely started. &#8220;Our tax dollars at sleep.&#8221; The current project is very simple, yet it&#8217;s taking years just to modify a few miles of flat road. After Ivan, the I-10 bridge across Escambia Bay took less time to plan, survey, and build. This is like I-110 all over again: years and years of running a road project like a jobs program, making multiple mistakes, and ending up with a design that a smart 8th grader couple improve upon with an hour of observation and analysis. We deserve better. Follow the money.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: D</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426901</link>
		<dc:creator>D</dc:creator>
		<pubDate>Sun, 06 Sep 2020 23:00:39 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426901</guid>
		<description>They need to worry about finishing 9 mile first this is the longest road construction job I’ve ever seen it literally looks like it has gotten nowhere I agree with John they are too busy worried about tearing down the historical monuments then getting these roads done they should’ve built navy federal farther in the city instead of invading Beulah, it use to be so country out in Beulah not its a wreck!!</description>
		<content:encoded><![CDATA[<p>They need to worry about finishing 9 mile first this is the longest road construction job I’ve ever seen it literally looks like it has gotten nowhere I agree with John they are too busy worried about tearing down the historical monuments then getting these roads done they should’ve built navy federal farther in the city instead of invading Beulah, it use to be so country out in Beulah not its a wreck!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Robert Bruner</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426782</link>
		<dc:creator>Robert Bruner</dc:creator>
		<pubDate>Sat, 05 Sep 2020 08:51:25 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426782</guid>
		<description>You have heard the saying NIMBY?</description>
		<content:encoded><![CDATA[<p>You have heard the saying NIMBY?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: John</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426772</link>
		<dc:creator>John</dc:creator>
		<pubDate>Sat, 05 Sep 2020 04:00:16 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426772</guid>
		<description>Our local politicians are too busy tearing down monuments to have quick road construction work done.</description>
		<content:encoded><![CDATA[<p>Our local politicians are too busy tearing down monuments to have quick road construction work done.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Bree</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426764</link>
		<dc:creator>Bree</dc:creator>
		<pubDate>Sat, 05 Sep 2020 01:03:22 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426764</guid>
		<description>Slowest contractors ever doing nine mile project!!! Please don&#039;t let them do this one too!!!</description>
		<content:encoded><![CDATA[<p>Slowest contractors ever doing nine mile project!!! Please don&#8217;t let them do this one too!!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Becky</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426758</link>
		<dc:creator>Becky</dc:creator>
		<pubDate>Sat, 05 Sep 2020 00:22:27 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426758</guid>
		<description>Navy a Federal is the best thing to happen to the area. I’ve lived here 32 years. They brought 30,000 jobs to us.</description>
		<content:encoded><![CDATA[<p>Navy a Federal is the best thing to happen to the area. I’ve lived here 32 years. They brought 30,000 jobs to us.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Tate dad</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426742</link>
		<dc:creator>Tate dad</dc:creator>
		<pubDate>Fri, 04 Sep 2020 21:01:24 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426742</guid>
		<description>Navy federal is the worst thing to happen to that area. Rent prices have sky rocketed, and everything along 9 mile is so unaffordable for a single dad. I have been applying for the past 12 years at Navy Federal and have only gotten 2 interviews. Being the manager of the SSA mailroom &amp; QA , surely I would have thought I could have gotten a job in there mail room. NFCU is a joke.</description>
		<content:encoded><![CDATA[<p>Navy federal is the worst thing to happen to that area. Rent prices have sky rocketed, and everything along 9 mile is so unaffordable for a single dad. I have been applying for the past 12 years at Navy Federal and have only gotten 2 interviews. Being the manager of the SSA mailroom &amp; QA , surely I would have thought I could have gotten a job in there mail room. NFCU is a joke.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Phin</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426734</link>
		<dc:creator>Phin</dc:creator>
		<pubDate>Fri, 04 Sep 2020 20:23:23 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426734</guid>
		<description>Drew got turned down for a job at Navy Fed. What really hurt him was the rejection letter from Dollar Tree. Best of luck buddy!</description>
		<content:encoded><![CDATA[<p>Drew got turned down for a job at Navy Fed. What really hurt him was the rejection letter from Dollar Tree. Best of luck buddy!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Vfw</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426733</link>
		<dc:creator>Vfw</dc:creator>
		<pubDate>Fri, 04 Sep 2020 19:48:04 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426733</guid>
		<description>Pine forest ..  A problem only because of bad Government over the years .. Road dept. Florida State.. All of the above</description>
		<content:encoded><![CDATA[<p>Pine forest ..  A problem only because of bad Government over the years .. Road dept. Florida State.. All of the above</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Paul</title>
		<link>http://www.northescambia.com/2020/09/fdot-virtual-update-nine-mile-road-study-from-pine-forest-to-mobile-highway/comment-page-1#comment-426731</link>
		<dc:creator>Paul</dc:creator>
		<pubDate>Fri, 04 Sep 2020 19:46:35 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=415554#comment-426731</guid>
		<description>I agree with Drew...The Credit Union&#039;s traffic coming out of their campus should be routed to the interstate. This would allow their employees and the local residents a better quality of life.

I do have to agree with everyone about Roads, Inc...snails pace...must be milking the state for millions in over runs and cost.  State Road 87 was started and completed in more time than this project.  

Additionally, WHY is there a U-turn at Navy Federal Way?  Your making the residents of the small neighborhood on Nature Creek Blvd turn west to go east!  Update the median so that they can turn left from their own road!</description>
		<content:encoded><![CDATA[<p>I agree with Drew&#8230;The Credit Union&#8217;s traffic coming out of their campus should be routed to the interstate. This would allow their employees and the local residents a better quality of life.</p>
<p>I do have to agree with everyone about Roads, Inc&#8230;snails pace&#8230;must be milking the state for millions in over runs and cost.  State Road 87 was started and completed in more time than this project.  </p>
<p>Additionally, WHY is there a U-turn at Navy Federal Way?  Your making the residents of the small neighborhood on Nature Creek Blvd turn west to go east!  Update the median so that they can turn left from their own road!</p>
]]></content:encoded>
	</item>
</channel>
</rss>
