<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Molino Road To Be Closed For Bridge Replacement</title>
	<atom:link href="http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Fri, 10 Apr 2026 14:47:29 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Amy</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334441</link>
		<dc:creator>Amy</dc:creator>
		<pubDate>Mon, 26 Dec 2016 19:40:18 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334441</guid>
		<description>Im like you Chris I live right on Molino Road just west of Chance Road... Can&#039;t wait for some quiet time and living on a hill some vehicles pop up going at least 70 or more. Folks are so reckless in this area with Chance Rd at the bottom of a blind hill. Wish they&#039;d close it today!!!</description>
		<content:encoded><![CDATA[<p>Im like you Chris I live right on Molino Road just west of Chance Road&#8230; Can&#8217;t wait for some quiet time and living on a hill some vehicles pop up going at least 70 or more. Folks are so reckless in this area with Chance Rd at the bottom of a blind hill. Wish they&#8217;d close it today!!!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Burnie D,Silcox</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334408</link>
		<dc:creator>Burnie D,Silcox</dc:creator>
		<pubDate>Sun, 25 Dec 2016 19:48:57 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334408</guid>
		<description>I live on Sunshinehill Rd It is a very narrow old paved rd. Its about 1 mile from Molino Rd.  to Crabtree Church Rd. Now for 9 mo. our little 35 mph Rd Will be full of 60 mph drivers ,Big Logging Trucks etc.Could they put some temp. speed bumps in ?  Or a police car. Narrow rd. children &amp; pups. Hidden Driveways. Mark my word, some one will be in a crash or two in this time frame. Put Temp bridge like Hwy 97 was.</description>
		<content:encoded><![CDATA[<p>I live on Sunshinehill Rd It is a very narrow old paved rd. Its about 1 mile from Molino Rd.  to Crabtree Church Rd. Now for 9 mo. our little 35 mph Rd Will be full of 60 mph drivers ,Big Logging Trucks etc.Could they put some temp. speed bumps in ?  Or a police car. Narrow rd. children &amp; pups. Hidden Driveways. Mark my word, some one will be in a crash or two in this time frame. Put Temp bridge like Hwy 97 was.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Molino Girl</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334365</link>
		<dc:creator>Molino Girl</dc:creator>
		<pubDate>Sun, 25 Dec 2016 04:14:02 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334365</guid>
		<description>Just out of curiosity….why would it take so long to replace this tiny bridge?  Is the 265 day time period from the beginning of planning and engineering to the end of project or just the construction time for the bridge itself?  Just wondering because I&#039;ve read that the 3-lane 1-10 west bound part of the Escambia bay bridge span took less than 2 yrs to complete.  Construction began in early 2006 and finished at the end of 2007 so if they can do that much major work in 2 yrs…maybe they need to hire those guys and get in done in about a week…lol.

Chris in Molino - I know how you feel…wish we had some bridges to close on Hwy 97.</description>
		<content:encoded><![CDATA[<p>Just out of curiosity….why would it take so long to replace this tiny bridge?  Is the 265 day time period from the beginning of planning and engineering to the end of project or just the construction time for the bridge itself?  Just wondering because I&#8217;ve read that the 3-lane 1-10 west bound part of the Escambia bay bridge span took less than 2 yrs to complete.  Construction began in early 2006 and finished at the end of 2007 so if they can do that much major work in 2 yrs…maybe they need to hire those guys and get in done in about a week…lol.</p>
<p>Chris in Molino &#8211; I know how you feel…wish we had some bridges to close on Hwy 97.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: William</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334301</link>
		<dc:creator>William</dc:creator>
		<pubDate>Sat, 24 Dec 2016 03:21:03 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334301</guid>
		<description>&gt;&gt;&gt;Wondering why signs say bridge closure staring 12/20 when it is still open as of today 12/23.

Somebody forgot to the tell the sign guy.  &quot;beginning the first week of January&#039;</description>
		<content:encoded><![CDATA[<p>>>>Wondering why signs say bridge closure staring 12/20 when it is still open as of today 12/23.</p>
<p>Somebody forgot to the tell the sign guy.  &#8220;beginning the first week of January&#8217;</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: James</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334300</link>
		<dc:creator>James</dc:creator>
		<pubDate>Sat, 24 Dec 2016 01:44:14 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334300</guid>
		<description>Wondering why signs say bridge closure staring 12/20 when it is still open as of today 12/23.</description>
		<content:encoded><![CDATA[<p>Wondering why signs say bridge closure staring 12/20 when it is still open as of today 12/23.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Jodie</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334252</link>
		<dc:creator>Jodie</dc:creator>
		<pubDate>Fri, 23 Dec 2016 01:23:07 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334252</guid>
		<description>Why is it going to take 12 months to replace Now? The project was only suppose to last 6 months! What the heck?</description>
		<content:encoded><![CDATA[<p>Why is it going to take 12 months to replace Now? The project was only suppose to last 6 months! What the heck?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: chris in Molino</title>
		<link>http://www.northescambia.com/2016/12/molino-road-to-be-closed-for-bridge-replacement-2/comment-page-1#comment-334237</link>
		<dc:creator>chris in Molino</dc:creator>
		<pubDate>Thu, 22 Dec 2016 18:44:25 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=272715#comment-334237</guid>
		<description>Wow, i thought it was only 6 months of bliss, now you tell me 9. Thanks so much. No more log trucks and everyone else and their grandma doing 80mph by my house. Like i said before, with all traffic diverted to Crabtree Church, i bet they do something about the speed. 
Not that it matters. I&#039;ll be thankful for the 9 months of peace and quiet.</description>
		<content:encoded><![CDATA[<p>Wow, i thought it was only 6 months of bliss, now you tell me 9. Thanks so much. No more log trucks and everyone else and their grandma doing 80mph by my house. Like i said before, with all traffic diverted to Crabtree Church, i bet they do something about the speed.<br />
Not that it matters. I&#8217;ll be thankful for the 9 months of peace and quiet.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
