<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Escambia Road Department Ready For Possible Snow, Ice</title>
	<atom:link href="http://www.northescambia.com/2010/01/escambia-road-department-ready-for-possible-snow-ice/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2010/01/escambia-road-department-ready-for-possible-snow-ice</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Sat, 25 Apr 2026 13:09:38 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Oversight</title>
		<link>http://www.northescambia.com/2010/01/escambia-road-department-ready-for-possible-snow-ice/comment-page-1#comment-29057</link>
		<dc:creator>Oversight</dc:creator>
		<pubDate>Thu, 07 Jan 2010 19:19:06 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=13632#comment-29057</guid>
		<description>Watch out for all of US 29 from Molino to Century.  The roadway is in very poor condition with countless low spots where the asphalt coming up.  In these areas, there likely will be pockets of ice forming due to standing water.  
I can&#039;t believe that FDOT is not considering re-surfacing the full stretch of US 29 to Century, but is only going to repair four miles of road to the point just south of the now defunct McDavid saw mill.  Maybe if enough folks write or call in complaints to the regional office, we&#039;ll see FDOT fix the entire length.</description>
		<content:encoded><![CDATA[<p>Watch out for all of US 29 from Molino to Century.  The roadway is in very poor condition with countless low spots where the asphalt coming up.  In these areas, there likely will be pockets of ice forming due to standing water.<br />
I can&#8217;t believe that FDOT is not considering re-surfacing the full stretch of US 29 to Century, but is only going to repair four miles of road to the point just south of the now defunct McDavid saw mill.  Maybe if enough folks write or call in complaints to the regional office, we&#8217;ll see FDOT fix the entire length.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
