<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: $20 Million Approved To Repave Highway 97, Part Of Highway 29</title>
	<atom:link href="http://www.northescambia.com/2009/05/20-million-approved-to-repave-highway-97-part-of-highway-29/feed" rel="self" type="application/rss+xml" />
	<link>http://www.northescambia.com/2009/05/20-million-approved-to-repave-highway-97-part-of-highway-29</link>
	<description>Local News for Molino, Bratt, McDavid, Century, Walnut Hill, Cantonment</description>
	<lastBuildDate>Mon, 13 Apr 2026 18:00:41 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Sherry Bloodsworth</title>
		<link>http://www.northescambia.com/2009/05/20-million-approved-to-repave-highway-97-part-of-highway-29/comment-page-1#comment-12404</link>
		<dc:creator>Sherry Bloodsworth</dc:creator>
		<pubDate>Tue, 26 May 2009 19:08:35 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=8456#comment-12404</guid>
		<description>This is a good thing, but their is much work yet to be done up on the northend. 

It would also be VERY benficial for the road dept. to repave Hwy 99, as this road saves the residents and visitors from Pensacola much time and miles visiting  Bratt Elementary and Northview High School. 
If you take Hwy.97 to Hwy.4, you are technically going way out of the way to get to the same place that Hwy. 99 takes you in less time. PLEASE...widen and repave this road, it is desperately needed, especially for the school bus drivers. 

ALSO...I definately agree with bwayne above, about the railroad situation. It gets really frustrating and is just plain rediculous. If this were in Pensacola, it would have been corrected a long time ago. The northend residents pay the same taxes as those living within the city limits and deserve just as much consideration and respect to existing long term problems.   Thank you</description>
		<content:encoded><![CDATA[<p>This is a good thing, but their is much work yet to be done up on the northend. </p>
<p>It would also be VERY benficial for the road dept. to repave Hwy 99, as this road saves the residents and visitors from Pensacola much time and miles visiting  Bratt Elementary and Northview High School.<br />
If you take Hwy.97 to Hwy.4, you are technically going way out of the way to get to the same place that Hwy. 99 takes you in less time. PLEASE&#8230;widen and repave this road, it is desperately needed, especially for the school bus drivers. </p>
<p>ALSO&#8230;I definately agree with bwayne above, about the railroad situation. It gets really frustrating and is just plain rediculous. If this were in Pensacola, it would have been corrected a long time ago. The northend residents pay the same taxes as those living within the city limits and deserve just as much consideration and respect to existing long term problems.   Thank you</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: bwayne</title>
		<link>http://www.northescambia.com/2009/05/20-million-approved-to-repave-highway-97-part-of-highway-29/comment-page-1#comment-12345</link>
		<dc:creator>bwayne</dc:creator>
		<pubDate>Tue, 26 May 2009 10:38:32 +0000</pubDate>
		<guid isPermaLink="false">http://www.northescambia.com/?p=8456#comment-12345</guid>
		<description>They will continue to sink money into that stretch of hwy, and tout their accomplishment of it being an evac route, but until they build an overpass over the csx switching tracks at the Cantonment papermill, it will never be a viable north/south corridor.  They continue to ignore the problem of that train impeding traffic for hours during the most heavily trafficked times and successfully cutting the artery to progress into and out of Pensacola.  They are placing a bandage on something that needs major surgery.</description>
		<content:encoded><![CDATA[<p>They will continue to sink money into that stretch of hwy, and tout their accomplishment of it being an evac route, but until they build an overpass over the csx switching tracks at the Cantonment papermill, it will never be a viable north/south corridor.  They continue to ignore the problem of that train impeding traffic for hours during the most heavily trafficked times and successfully cutting the artery to progress into and out of Pensacola.  They are placing a bandage on something that needs major surgery.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
